Day 8 New Church Floor Project - Cement Backer Board Going In

posted by Webmaster

Monday the crew was back at work. The dumpster was filled with sanctuary carpeting, and pallets with mortar and hardwood flooring, as well as stacks of cement backer board were in the staging area outside the northwest door.


The carpet came out of the sanctuary, revealing a linoleum floor beneath, and exposing the areas where the original sanctuary was added on to.




The cement backer board was being installed, by floating the pieces in a bed of mortar to insure a secure and level surface for tile installation.



Meanwhile in the choir loft the pews were being taken out, and boxes of hardwood flooring were being brought upstairs.



Things are moving right along! More pictures tomorrow.