Even though it's the weekend, the floor installers are hard at work. Today they were laying the aisle tiles. There will be medallions in the aisle so they placed tiles temporarily in those spaces in order to make everything else square. Those tiles will be lifted out when it's time to install the medallions.






Turns out the servers sacristy was not tiled yet, but the backer board is in place.


Today the carpet was taken off the main choir loft stairs.


Hardwood floor installation continued in the loft.

Mark Sommers who is kindly building a platform for the choir risers, was working on the opposite side of the loft to get it ready for floor installation. This side will include space for the piano.