DAY 25 Church Floor Project - Medallions Arrive, Polished Tiles

posted by Webmaster

The church is quite a mess right now, with the grout-smeared tiles adding to the already impressive coat of dust that covers everything, and which is still suspended in the air. The cleaning volunteers are scheduled to come Saturday though!

The polished tiles have now been set on the tabernacle steps. These are not grouted yet.


The medallions also were delivered today. They are in a stack of boards on a pallet. Below you can see some parts of the Duc in Altum (aka boat) waterjet medallion. Though the pieces are grouped together in sections, they are not attached to each other or anything. Each individual tile is loose, and will be installed one piece at a time.




The lettering was sandblasted into the tiles, and painted with an industrial paint to match the gold tiles used in the borders. Here you see a little of the Polish and English wording.

Labels:


 

This page is powered by Blogger. Isn't yours?

Subscribe to Posts [Atom]

This Stevens Point Website designed by Promotion Web Design