DAY 15 Church Floor Project
posted by Webmaster
The tile installers were busy yesterday! Both sides of the pew area were finished up to the point where the choir loft begins.


The Building and Grounds Committee members stopped by to check on the progress:
In the choir loft, we get a peek at how the platform will look with the hard wood flooring on top next to the bull nose trim.



The Building and Grounds Committee members stopped by to check on the progress:
In the choir loft, we get a peek at how the platform will look with the hard wood flooring on top next to the bull nose trim.
Labels: church-floor-project
Subscribe to Posts [Atom]
This Stevens Point Website designed by Promotion Web Design



