DAY 14 Church Floor Project

posted by Webmaster

Tile installation continued over the weekend. With the center aisle in place (leaving the tiles loose in the spots the medallions will be), the workers moved on to the front of the church, starting to lay some of the tiles for the pew bank on the Mary side.


The vestibule will be mainly gold tile, with a border around the walls.

The choir loft floor now reaches all the way to the back wall on the left side, and the carpenter started putting the bull nose on the platforms. It's going to look gorgeous.

Labels:


 