The volunteer cleaning crew came to the rescue once again to get the church ready for Masses this weekend, even though construction is not quite finished. Scrubbing of tiles and wiping down of pews and cleaning every possible surface started Friday evening in the sacristy and continued Saturday morning into the afternoon in the church.







The Loaves and Fishes medallion on the sanctuary floor was clean enough to snap a photo.


The new floor and refinished pews (well most of them anyway) had their debut at the 4 PM Mass.

Here's a closer look at the sanctuary set up for Mass tomorrow AM:

In the meantime Saturday night finds the crew busily installing the pews that just arrived this evening, as well as the book racks. Modesty panels will be coming next week to go in front of the first row of pews. The first row will be shorter, allowing a wheelchair area on the inside ends of the first row.

This week the crew will finish installing floors in the choir loft and on the stairways, put a carpet runner on the main choir loft stairway, install shoe molding around the baseboards in the church, and fix up some uneven tiles and other odds and ends.

Because of the ongoing work, Wednesday Eucharistic adoration will be held in Kolbe Hall from 8:30 - 5 PM. Hopefully the regular 24 hour schedule will resume the following week.