The medallions are all installed and grouted, and Monday the tile installers were cutting the interesting pieces of tile that were needed to fill in the aisle around the medallions. The grout color for the medallions is gold toned, which picks up the color of the lettering and the tile used for the borders in the medallions. It almost looks as though the pieces of tile were outlined with brass. The photos don't quite capture this effect... you'll have to see it in real life.





Pews will start arriving today (Tuesday) along with more workers to install them, and Thursday the second load of pews will arrive. Baseboards are stained (as seen above on the left) and ready to be nailed in. Once the main church's tile and pews are finished, the carpet in the confessional is next. Last on the list is the hardwood floor for the choir loft and stairways. The end is in sight!





Pews will start arriving today (Tuesday) along with more workers to install them, and Thursday the second load of pews will arrive. Baseboards are stained (as seen above on the left) and ready to be nailed in. Once the main church's tile and pews are finished, the carpet in the confessional is next. Last on the list is the hardwood floor for the choir loft and stairways. The end is in sight!Labels: church-floor-project
Subscribe to Posts [Atom]
This Stevens Point Website designed by Promotion Web Design