Day 3 New Church Floor Project: Pews & Carpet Out

posted by Webmaster

The Church Interiors two-man crew spent the day dismantling pews. The big truck arrived, had to have the tile unloaded from it into another truck, then was re-loaded with pews. However the pews had a multitude of screws holding them together, with many varieties of screw heads (requiring a trip to Frank's Hardware to find the right bits for the electric screwdrivers), and a lot of the screws were stripped and had other screws put in right next to them, making even more work.








By sunset only a little over half the church's pews were dismantled. Gary Glodoski called in his parish volunteer crew to the rescue, and between them, the Church Interiors crew, and the husband-wife truck driver team, the pews were all on the truck by 11 PM.








Then it was time for the carpet to come out! The photographer bailed at 12:45 AM, when maybe 1/3 of the carpet on the main floor was out. Those guys were in for a long night.




Asbestos removal is Wednesday - Friday so there will be no more interior pictures until that's finished. But stay tuned for more updates!

Labels:


 

This page is powered by Blogger. Isn't yours?

Subscribe to Posts [Atom]

This Stevens Point Website designed by Promotion Web Design